Exploration budgets are judged by meters of good core recovered, not by meters drilled. If you are working out how to choose a core drilling rig, the first job is to agree with your geologists on core size and target depth, because those two numbers set nearly every other specification.
This guide explains the standard wireline sizes (BQ, NQ, HQ and PQ), how depth ratings change with size, and the difference between spindle and top drive rigs. It also covers mounting options, tooling and when a geotechnical rig is the better fit.
We keep the numbers to widely published standard dimensions and describe the rest as trade-offs. For the full line of rigs, bits and downhole tools, visit our drilling and mining equipment section.
Core Size: What NQ, HQ and PQ Actually Mean
Wireline core sizes follow a widely used letter system. The letter sets the hole and core diameter, and the Q suffix refers to the wireline rod series.
- BQ gives a core of roughly 36 mm from a hole of about 60 mm.
- NQ gives a core of roughly 48 mm from a hole of about 76 mm.
- HQ gives a core of roughly 63 mm from a hole of about 96 mm.
- PQ gives a core of roughly 85 mm from a hole of about 122 mm.
Treat these as nominal values. Exact dimensions vary slightly by bit and supplier, and thin-wall or metric systems use their own sizes.
Larger core gives more sample per meter and usually better recovery in broken ground, which matters for metallurgical testing and geotechnical logging. Smaller core is faster and cheaper to drill and lets a given rig reach greater depth.
Many programs start a hole at a larger size such as PQ or HQ through weathered ground, then reduce to NQ at depth. This telescoping approach lets you case off unstable zones and still reach target. If you plan to reduce, the rig must be rated for the full depth at the smallest size and for the upper section at the larger size.
| Size | Approx. core diameter | Approx. hole diameter | Typical use |
|---|---|---|---|
| BQ | About 36 mm | About 60 mm | Deep, small-diameter exploration |
| NQ | About 48 mm | About 76 mm | Common size for mineral exploration |
| HQ | About 63 mm | About 96 mm | Better recovery in broken ground |
| PQ | About 85 mm | About 122 mm | Weathered zones, metallurgical samples |
| Depth effect | Larger core | Larger rods and bit | Lower rated depth on the same rig |
Depth Capacity: Reading the Rating Chart
Core rig specifications usually list several depth figures, one for each rod size. The deepest figure applies to the smallest size, and the rating falls as you step up to HQ and PQ.
The reason is simple. Larger rods weigh more per meter, so the hoist or pull-back force needed to lift the string rises with size and depth. Larger bits also need more torque.
When you compare rigs, look at:
- Rated depth at your core size, not the headline maximum.
- Hoist and feed pull-back force, with margin for stuck rods.
- Rotation speed range. Diamond coring needs high rotation speed, especially at smaller sizes.
- Torque at low speed for reaming, casing and larger sizes.
- Mud pump flow and pressure to cool the bit and flush the face at depth.
Most drillers prefer working well below the rated maximum. Running a rig near its limit for a whole program increases wear and leaves little margin for a stuck string. Choose a rig whose rating comfortably exceeds your deepest planned hole at the size you will use there.
Ask suppliers to state depth ratings for vertical holes and to explain how inclined holes affect them.
Core Drilling Rig - Selection and Specification Checklist
12 points to settle before you request quotes – print it or send it back to us filled in.
Wireline vs Conventional Coring
In conventional coring, the entire rod string must be pulled from the hole to recover each core barrel. That is manageable in shallow holes but becomes slow as depth increases, because every trip takes longer.
Wireline coring solves this. The inner tube, which holds the core, is retrieved through the rods on a thin cable using an overshot. The rods stay in the hole, protecting the borehole wall, and are only pulled when the bit needs changing.
Why wireline is the standard for exploration
- Much less tripping time on deeper holes.
- Better hole stability because the rods stay in place.
- Less disturbance to core in broken ground.
Conventional or single-tube coring still has a place for very shallow holes, some geotechnical work and certain soft formations.
For a wireline rig, check the wireline winch capacity and rope length for your deepest hole, and confirm the rod series matches the core size you plan to use. Our NQ NTW core drilling rig is an example built around small-diameter exploration coring.
Wireline tools wear too. Overshots, latches and inner tube parts should be on the spares list.
Spindle Rigs vs Full-Hydraulic Top Drive Rigs
Core rigs mostly fall into two families.
Spindle (chuck) rigs
A vertical spindle rig rotates the rods through a chuck, usually driven via a mechanical gearbox. The stroke is short, so rods are re-chucked frequently. These rigs are mechanically simple, often lower in cost, and familiar to many drill crews. They suit moderate-depth programs where field repair with basic tools is important.
Full-hydraulic top drive rigs
A top drive rig moves the rotation head along a mast with a long feed stroke, often covering a full rod length. That cuts rod handling time, allows angled holes more easily, and gives finer control of feed pressure. Hydraulic systems need cleaner oil and more skilled maintenance, so consider your service capability.
Our core and exploration drilling rigs range includes both families. The crawler-mounted full-hydraulic surface core drill rig is a top drive example. Spindle-type geological rigs remain a practical choice for many contractors.
Also check angle drilling. Exploration holes are often inclined to cross the ore body, so confirm the mast angle range and how the rig is stabilized.
Ask for rod handling options too, since lifting rods by hand is a major source of crew fatigue.
Mounting, Access and Site Conditions
Exploration sites are often remote, steep or environmentally sensitive. Access usually decides the carrier.
- Crawler mounted rigs self-propel over rough ground and set up quickly between nearby holes.
- Skid mounted rigs can be moved by truck, crane or sometimes helicopter in modular pieces.
- Truck mounted rigs suit sites with road access and long distances between holes.
- Compact and portable rigs fit tight underground stations or areas where clearing a large pad is not allowed.
Consider also the support layout. A core rig needs a water supply, a mud pump, mixing tanks, rod racks and space to lay out core trays. Water can be a major constraint in arid regions, so ask how much the rig and pump consume and whether recirculation is practical.
Altitude and cold matter too. Diesel engines lose power at high altitude, and hydraulic oil and water lines need protection in freezing conditions. Give your supplier the site elevation and temperature range so the engine and hydraulics can be matched.
For remote programs, list what must travel with the rig, such as tanks, pumps and generators. Agree on how the rig will be broken down for transport if access is by small truck or helicopter.
Tooling, Consumables and Geotechnical Alternatives
Budget the tooling package alongside the rig. It drives day-to-day productivity and running cost.
Core bits and barrels
Impregnated diamond bits are widely used in hard, abrasive rock, while surface-set and carbide-type bits suit softer or broken formations. Bit matrix hardness should be matched to the rock: harder rock generally calls for a softer matrix so fresh diamonds keep exposing. See our diamond and carbotec core bits for the bit types we supply.
Rods, casing and recovery tools
Order enough rods for the deepest hole plus spares, casing for unstable zones, and fishing or recovery tools for stuck strings. Our drill bits, rods and downhole tools range covers these items.
When a geotechnical rig fits better
If the job is site investigation for construction, such as standard penetration tests and soil sampling at shallow depth, a dedicated rig is often more efficient than a full exploration core rig. Our geotechnical and soil sampling rigs include SPT and vibratory sampling units, such as the compact SPT drill rig.
Ship a starter set of consumables with the rig so drilling can begin while you set up local supply.
Frequently asked questions
What is the difference between NQ and HQ core?
NQ produces a core of roughly 48 mm from a hole of about 76 mm, while HQ produces roughly 63 mm core from a hole of about 96 mm. HQ gives more sample and often better recovery in fractured rock, but needs heavier rods and more rig capacity. That means a given rig reaches less depth at HQ than at NQ.
Why does a core rig have several depth ratings?
Each rating applies to a different rod size. Larger rods are heavier per meter, so the hoist force needed to lift the string grows with both size and depth. The smallest size gives the deepest rating. Always compare rigs at the core size you will use at the bottom of your deepest hole.
Is wireline coring always better?
For most mineral exploration beyond shallow depths, yes. Wireline lets you recover the inner tube without pulling the rods, which saves a great deal of tripping time and keeps the hole stable. Conventional coring can still make sense for very shallow holes or some geotechnical and soft-ground work where wireline brings little benefit.
Should I choose a spindle rig or a top drive rig?
Spindle rigs are mechanically simple and easier to repair in remote areas. Top drive rigs offer a longer feed stroke, faster rod handling and easier angle drilling, but need cleaner hydraulics and trained maintenance. Choose based on hole depth, how many inclined holes you plan, and the service skills available on your sites.
Can one rig handle both exploration coring and SPT testing?
Some multi-purpose rigs can do both, but a full exploration core rig is often oversized for shallow standard penetration testing and soil sampling. A dedicated geotechnical rig is usually lighter, cheaper to move and set up for SPT hammers. If your work mixes both, tell us the split and we can suggest a practical combination.
Next step
Choosing a core rig comes down to core size, depth at that size, wireline capability, rig type and site access, followed by a tooling package to match. Fix those with your geologists first. Then review our core and exploration drilling rigs, see how percussion rigs differ in our DTH vs top hammer guide, and request a quote with your program details.