Skip to content
Buyer guide

Underground Drill Jumbos: Boom Count, Coverage and Choosing the Right Rig

A practical buyer's guide to underground drill jumbos: how face size sets boom count, what feed length does to your round, which site services a rig needs, and how tunnel and mine rigs differ.

Most jumbo purchases go wrong in the same place: the buyer picks a rig from a brochure before pinning down the heading it has to drill. A drill jumbo for tunnelling is sized by the face it covers, the round it pulls and the services your site can supply. Get those three right and the model choice becomes short.

This guide walks through the decisions in the order an engineer would make them: tunnel profile and rock, boom count and coverage, feed and rock drill, carrier and power, the difference between civil tunnel jumbos and mine development rigs, and controls. It ends with what to send a supplier so a quotation can be compared like for like.

If you are still mapping the wider equipment fleet for a project, start with our overview of tunnelling equipment, then come back here for the drilling rig itself.

Start With the Heading, Not the Rig

Before comparing machines, write down the excavation the rig will work in. A jumbo that suits a 4 m wide mine drive will struggle in a 12 m road tunnel, and a large three-boom rig may not even tram into a small heading.

Profile and face area

Record the width, height and shape of the excavated profile, plus the face area in square meters. Note any enlargements such as lay-bys, cross passages, sumps or loading bays, because the rig must cover the largest face it will drill and still fit through the smallest section it passes.

Rock and round length

Rock strength and abrasiveness drive rock drill choice and bit wear. Fractured ground may limit how far you can advance per blast and how much bolting follows each round. Your planned round length, together with the drill plan from the blasting engineer, sets the feed length you need.

Cycle and logistics

Think about how the jumbo fits the cycle: drilling, charging, blasting, ventilation, mucking, scaling and support. If one rig must also drill bolt holes or work in several headings, mobility and setup time matter as much as drilling speed.

Finally, check gradient, floor conditions and turning space. Steep declines in mine ramps and tight intersections narrow the carrier options quickly, and they are easy to overlook on a desk-based specification.

Boom Count and Face Coverage

Boom count is the first real fork in the decision. More booms drill a face faster, but they add width, weight, cost and maintenance. The right number follows from face area and the cycle time you are aiming for.

  • Single-boom rigs are typically used in small headings, mine drives and utility tunnels, often up to roughly 30 m² of face. They are compact, simpler to maintain and easier to move between headings.
  • Two-boom rigs are the common middle ground for mine development and mid-size tunnels, often covering faces up to roughly 100 m². Two operators or a computer-assisted system can drill both sides of the face at once.
  • Three-boom rigs are generally chosen for large road, rail and hydropower tunnels, where face area and advance rate justify the bigger carrier.

These coverage figures are general industry ranges, not limits for a particular model. Always check the manufacturer’s coverage drawing against your own profile, including the reach needed for the corners, the crown and the invert.

Some projects add a basket or utility boom for charging and scaling, or a dedicated bolting boom. That can save a second machine in small headings, but it adds weight and complexity to the jumbo.

Browse the range of tunnel drill jumbos and face rigs with your profile drawing to hand. Compare models such as the Tunneling Jumbos DT821 with compact options like the underground face drilling rigs for the small range, and confirm boom count and coverage for your section before shortlisting.

Typical jumbo configurations by heading size (general industry ranges)
FactorSingle-boom rigTwo-boom rigThree-boom rig
Typical face areaSmall headings, often up to roughly 30 m²Mid-size faces, often up to roughly 100 m²Large faces above that range
Common useMine drives, utility and small tunnelsMine development, mid-size tunnelsRoad, rail and hydropower tunnels
MobilityHighest; easy to move between headingsGood; suits multi-heading minesLowest; suits long single drives
Drilling speed per faceLowestModerateHighest
Width and weightCompactMediumLarge and heavy
Maintenance loadLowestModerateHighest
/ Free PDF checklist

Underground Drill Jumbo Specification Checklist

12 points to settle before you request quotes – print it or send it back to us filled in.

We use your email only to send related information. No spam.

Feed Length, Rock Drill and Hole Design

The feed holds the drill rod and sets the maximum hole depth per pass. Feed length is chosen to match the round length in your drill plan, with a little extra for look-out angle and the fact that holes rarely pull 100 percent of their drilled depth.

Longer feeds pull longer rounds and reduce the number of blast cycles per meter of advance. They also need more space to swing at the face and can be awkward in small or irregular headings. Many buyers ask for the feed length that fits their typical round, rather than the longest available.

Hole diameter

Face blast holes in tunnelling are commonly drilled in the region of 43 to 51 mm, with larger reamed holes in the cut. Bolt holes have their own diameter set by the bolt type. Tell the supplier both, because they influence rod, shank and bit selection.

Rock drill

Hydraulic rock drills differ in impact power, rotation torque and the hole sizes they handle well. Harder rock and larger holes call for more energy, while softer or fractured rock benefits from good feed and rotation control to avoid jamming.

Ask for the recommended drill steel package with the rig: shank adapters, rods, couplings and bits. Mismatched steel is a common cause of poor penetration and early wear, and it is much cheaper to settle at the specification stage than after the rig arrives.

If you also run surface blast-hole work alongside the tunnel, our guide to sizing a portable air compressor for DTH drilling covers the air side of that equipment.

Carrier, Power and Site Services

A jumbo is a carrier, a power pack and one or more booms. The carrier must suit your tunnel, and the power pack must suit the services you can provide at the face.

Electric drilling, diesel tramming

Most modern jumbos drill on electric-hydraulic power and tram on a diesel engine. That keeps exhaust out of the heading during the longest part of the cycle. You will need a suitable electrical supply at the face, a cable reel sized for the distance between moves and a voltage and frequency that match your site. State these clearly, because they vary between countries and projects.

Battery-electric carriers are growing in mining, but check charging infrastructure and duty cycle before assuming they fit.

Water and air

Hydraulic rock drills use water flushing to clear cuttings and suppress dust, so the rig needs a reliable water supply at adequate pressure. Many rigs also use a small compressed air flow for shank lubrication, often from an onboard compressor.

Carrier and dimensions

Check overall width, height, tramming length and turning radius against your smallest section and tightest bend. Ask about ground clearance, gradeability and brake performance if you work on declines.

Underground diesel engines are subject to local emission and ventilation rules. Confirm the engine standard your mine or tunnel authority requires before ordering, because changing it after the rig is built is rarely practical.

Tunnel Jumbos vs Mine Development Rigs

The machines look similar, and many models can do both jobs. The difference is in what the site prioritizes.

Civil tunnels

Road, rail, water and hydropower tunnels often have larger, consistent profiles and a strong focus on accurate contour drilling. Overbreak costs money in extra concrete and shotcrete, so precise hole placement and good boom positioning tend to rank high. Three-boom and computer-assisted rigs are more common here.

Underground mines

Mine development drives are usually smaller and spread across many headings, so mobility, robustness and ease of service often matter more than peak drilling speed. Single and two-boom development rigs dominate. Explore our underground mining drill rigs for this type of work, including the Development Drill Rigs DD422I and Development Drill Rigs DD321; check boom count and coverage for each against your drive profile.

Coal mines and gassy ground

Coal and other gassy mines generally require explosion-protected equipment approved under the rules of the country where the mine operates. Rigs built for coal roadways, including hydraulic tunnel drilling rigs and anchor rod drilling vehicles, are designed around those constraints. Confirm with your mine’s safety authority exactly which approval is required, and ask the supplier to show how the offered rig meets it, before you compare prices.

Ground support is the other big difference. In many mines the same heading needs rock bolting after each round, so plan whether the jumbo, a separate bolter or a combination rig will handle it.

Controls, Automation and Operator Skill

Jumbo controls range from direct hydraulic levers to fully computerized systems. The right level depends on your crew and your accuracy targets more than on the latest feature list.

  • Direct or hydraulic controls are simple, robust and easy for local mechanics to repair. They rely on operator skill for hole placement and are common in mining.
  • Electronic controls with angle indication help operators collar and align holes to the drill plan, improving contour quality without full automation.
  • Computerized rigs can load drill plans, position booms automatically and log drilling data. They typically reduce overbreak and variation between shifts, but they need trained operators, stable power and access to diagnostic support.

Ask yourself who will maintain the rig at 2 a.m. on a remote site. A sophisticated system that sits idle waiting for a technician costs more than the meters it saves. Many buyers choose a proven middle level of automation and invest in training instead.

Whatever level you choose, agree the operator and maintenance training plan, the manual language and the critical spares list as part of the purchase, not after delivery. Feed beams, hoses, seals, rock drill service kits and drill steel are the parts that keep a jumbo turning.

What to Send a Supplier for a Comparable Quote

A short, complete inquiry gets you quotations you can compare. Our in-house engineers in Shanghai use the same information to match a rig to your heading.

  1. Profile drawing with width, height, face area and the smallest section the rig must pass.
  2. Rock type, strength if known, and expected ground conditions.
  3. Drill plan or target round length, hole diameter and number of holes per face.
  4. Whether the rig also drills bolt holes, and the bolt type.
  5. Electrical supply at the face, water supply and any engine emission requirement.
  6. Gradient, altitude and ambient temperature range.
  7. Approvals required for coal or gassy mines, if applicable.
  8. Control level, training needs and the spares you want shipped with the rig.

Before shipment, the rig can go through pre-shipment inspection, which you can attend in person, follow by video or delegate to a third-party agency. Jumbos are large, heavy and often shipped partly dismantled, so ask how the rig will be packed and how the shipping and export documents will be handled. Every quotation states the price, the lead time and the shipping arrangement, so you can plan delivery against your excavation schedule.

Frequently asked questions

How do I choose the number of booms on a drill jumbo?

Start with face area and target cycle time. Single-boom rigs typically suit small headings up to roughly 30 square meters, two-boom rigs often cover mid-size faces up to roughly 100 square meters, and three-boom rigs suit large civil tunnels. Then check the specific model’s coverage drawing against your profile, and confirm the carrier fits your smallest section.

What feed length should a tunnelling jumbo have?

Match the feed to the round length in your drill plan, allowing for look-out angle and the fact that rounds rarely pull their full drilled depth. Longer feeds mean fewer blasts per meter of advance but need more room to maneuver. In small or irregular headings, a shorter feed is often more practical than the longest option available.

Can one rig handle both face drilling and rock bolting?

Some rigs can, either with a bolting attachment or by drilling bolt holes with the face boom and installing bolts separately. This can work well in small mine headings with a modest support load. Where bolting is heavy or continuous, a dedicated bolter usually keeps the cycle moving faster. Tell the supplier your bolt type and pattern so the options can be compared.

Do drill jumbos need compressed air?

Hydraulic jumbos drill with hydraulic power and flush with water, so they do not need the large air supply a DTH rig does. Many still use a small air flow for shank lubrication, often from an onboard compressor. Confirm with the supplier whether the offered rig has one or expects site air, and size your water supply carefully.

What extra requirements apply in coal mines?

Coal and other gassy mines generally require explosion-protected equipment approved under the local mining safety regulations. The exact approval differs by country, so check with your mine’s safety authority first. Then ask the supplier to show how the offered rig meets that requirement, and include the approval in your purchase order so there is no ambiguity at delivery.

Next step

The right jumbo follows from the heading: face area sets boom count, round length sets feed length, and site services decide the power pack and carrier. Settle controls, training and spares before you order, and the rig will spend its time drilling rather than waiting.

Send your profile drawing and drill plan through our quote request form, or browse the tunnel drill jumbo range to build your shortlist.

/ Free business quote

Let’s spec
your next
project.

Send your requirement — our engineers reply with the right equipment, pricing and lead time.

Talk to our experts

Call WhatsApp Get Quotation